POSCO SNG Project | ||||
Description | Qt’y | Material | Size | Weight per Unit(Ton) |
Gasifier Reactor | 3 | SA516-70N, SA516-70N + 304L | 4,100ID X 37,800L | 450 |
Post Reactor Residence Vessel | 3 | SA516-70N | 3,200ID X 41,100L | 260 |
180℃ Transition Piece | 3 | SA516-70N | 2,100ID X 12,030L | 60 |
Transition Piece | 3 | SA516-70N | 12,000ID X 45,120L | 150 |
Taean IGCC Power Plant Project | ||||
Description | Qt’y | Material | Size | Weight per Unit(Ton) |
Gasifier | 1 | SA387.11.CL2 | 5,900ID X 33,105L | 502.40 |
Transfer Duct | 1 | SA387.11.CL2 | 3,250ID X 11,352L | 73.20 |
GRC | 1 | SA387.11.CL2 | 3,600ID X 12,435L | 195.80 |
Syngas Cooler | 1 | SA387.11.CL2 | 3,600ID X 68,200L | 612.64 |
Economizer | 1 | SA387.11.CL2 | 1,560ID X 1,500L | 60.65 |